Saturday, October 20, 2018

At 5290: Final Stretch, Part 1 - October 2018

Our first home: 5290 Project

We're down to TWO months before closing. 

A LOT has been happening in this final stretch, which warrants two, separate posts, as we finish up this 5290 Project by December 2018.

Here is our October 2018:

  • Kitchen
    • Floor tile
    • Countertops!
    • APPLIANCES :)
    • Counter stools for island
    • Backsplash
    • Lights!!
  • Finish up Master Bathroom
    • Vanity, countertop and toilet
    • Wall tile
    • Mirror!
  • 10.26.18 CARPET Day


Kitchen

What an adventure it is to tile a kitchen floor... we tiled from 5:30PM until 1:30AM.
Here's the quick version in pictures.



It took a bit, but we powered through and are really happy with the results!
A few before and afters:


Oh, our lovely countertops!
Sam and Doug set and installed the walnut butcher block on the kitchen island:


 Then, we had the quartz countertops set for the bar and the rest of the kitchen surface.
Before and after - and close-ups.
Bar


Kitchen countertops:



 As of 10.30.2018, we have a FULLY functioning kitchen!
Here are our beautiful appliances:
Fridge and microwave
Stove/Oven
Dishwasher
We finally agreed on counter stools for the island within our price point. 
Sorry to replace the makeshift stools previously in operation (not sorry).

A welcome sight from the delivery guy!
Before.

After.
Mary's dad finished up the kitchen lighting (and other electrical work!). Thanks, Ron!

Kitchen backsplash installed:


Huge progress on the kitchen this month!


Master Bathroom

Vanity and countertop installed:

Walls tiled


Curbless shower, complete with shaving station!
Just awaiting our pane of glass to separate the toilet and shower.


Toilet


Fun mirror :)



Carpet day: 10.26.2018

Cleaning up to prepare for carpet day!
Start with the living roomHere are a few before and after shots:



Living room: After!


Now, the master bedroom. Before and after:

We did remove the fridge from the master bathroom.
After!



Our final month is just as full of excitement, including:


  • Exterior - replaced and painted siding
  • Back entry closet nook
  • We move in to the master bedroom!
  • Fun, deco lighting for the kitchen and bar
  • New front door
  • A couch, a chandelier, a fan


Stay tuned :)