Our first home: 5290 Project
SEPTEMBER 2017
5290 is big project, and we're up for it! I hope to capture the progress and transformation with ~monthly blog posts.
Goals for September 2017:
- Remove all carpet
- Patch and paint LR, K, BR1, BR2, hallways - including ceilings
- Refinish flooring in BR2, BR1, LV, FR and hallways
- Install closets in BR1, BR2, and Hallway
- Install new exterior door
Let's start with - what we're currently calling - the Great Room. So fancy, right?
These are pictures from the posting at Realtor.com:
Here are before/after pictures with carpet removal:
to
Then, a little bit of this ...
... and the Great Room became this:
to
Yes, we have a church pew.
Now, onto the 2 bedrooms.
Picture of
BR-1 from the posting at Realtor.com:
BR-1 Here are before/after pictures with carpet removal:
to
to
A little bit of this, again ...
... and
BR-1 became this:
to
to
Picture of
BR-2 from the posting at Realtor.com:
There is no light in this room (yet), so bear with the pictures on this one.
to
Finally, for September 2017 -
A new exterior (back) door!
And so, the story of the 5290 Project continues...